All Basic Parts In Their Places
So now all of the parts needed for actual operation came into place. Happy days!
First up was the X axis.
And a fee limit switches and some cable reattachment with Alvar and we have what could be a working (But ugly and fragile) CNC.
To quote an old colleague “stepper motors waking up are so cute”!
[wpvideo jc7KQ5Go ]
The next step was to check the rigidity of the entire construction….
Yeah, no breaks for me. I was hoping for about 0.02mm flex in the entire thing. Nut it was far above 0.05. That is probably worse than it was before the rebuild…. 🙁